{"id":17662,"date":"2026-03-20T15:29:35","date_gmt":"2026-03-20T15:29:35","guid":{"rendered":"https:\/\/www.peakpoint.pk\/en\/2026\/03\/20\/powering-lahore-airport-hi-mo-x10\/"},"modified":"2026-03-20T15:29:35","modified_gmt":"2026-03-20T15:29:35","slug":"powering-lahore-airport-hi-mo-x10","status":"publish","type":"post","link":"https:\/\/www.peakpoint.pk\/en\/2026\/03\/20\/powering-lahore-airport-hi-mo-x10\/","title":{"rendered":"Powering Lahore Airport with Hi-MO X10 Solar"},"content":{"rendered":"<p>LONGi&#8217;s <strong>Hi-MO X10<\/strong> monofacial solar modules have been selected to deliver a 1 MW installation for the terminal expansion at Allama Iqbal International Airport in Lahore, with work due to begin within the next two to three months. This marks the first deployment of solar modules at a major Pakistani airport and links the expansion directly to national sustainability goals by integrating advanced renewable technology into a key transportation hub.<\/p>\n<p>The project prioritised the unique demands of airport environments: uncompromising safety, long-term reliability, and visual harmony with the terminal architecture. The Hi-MO X10 modules were chosen for their airport-grade fire resistance, high efficiency and a pure all-black design that eliminates visible grid lines and reduces reflective glare, helping to preserve the airport\u2019s premium appearance while meeting operational safety standards.<\/p>\n<p>Built on Back Contact technology, the Hi-MO X10 delivers superior anti-shading performance that maintains higher generation under partial shading conditions common around airports. The modules\u2019 engineering also supports a 30-year extreme reliability profile, offering stakeholders confidence in stable energy output across decades and a lower total cost of ownership for this public infrastructure investment.<\/p>\n<p>The initial 1 MW phase has been designed with future expansion in mind, allowing additional capacity to be added as system performance and operational needs evolve. Beyond cutting the airport\u2019s carbon footprint, the installation is intended to set a benchmark for other Pakistani infrastructure projects by demonstrating how advanced solar solutions can meet stringent safety, aesthetic and longevity requirements.<\/p>\n<p>By selecting the Hi-MO X10 for Allama Iqbal International Airport, project leaders are combining efficient energy performance with anti-glare aesthetics and robust safety credentials, reinforcing the airport\u2019s role as a modern, eco-conscious gateway for Pakistan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hi-MO X10 airport solar modules will power a 1 MW installation at Allama Iqbal Airport, enhancing safety, appearance, and long-term reliability.<\/p>\n","protected":false},"author":7,"featured_media":17661,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[94],"tags":[],"class_list":["post-17662","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pakistan"],"_links":{"self":[{"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/posts\/17662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/comments?post=17662"}],"version-history":[{"count":0,"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/posts\/17662\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/media\/17661"}],"wp:attachment":[{"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/media?parent=17662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/categories?post=17662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.peakpoint.pk\/en\/wp-json\/wp\/v2\/tags?post=17662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}